Yes, Polyurethane Foam Lifting can be used to stabilize residential foundation footings, provided the settlement is minor to moderate and is primarily caused by soil voids. We utilize high-density polyurethane foam injection—often referred to as polyjacking—to fill those voids directly beneath the footings and lift settled concrete back into its original position.
This method offers several distinct advantages for residential properties:
While foam is an excellent, cost-effective solution for many homeowners, it is important to note that if footing settlement indicates deeper structural failure, alternative methods like Helical Piers or full underpinning may be required. As a family-owned and operated business since 1996, we provide custom assessments to determine which solution offers the superior performance your home needs.
All information is for general purposes; actual outcomes depend on site conditions. We recommend consulting a licensed structural engineer for definitive diagnosis. Estimates are preliminary until confirmed by an on-site inspection.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…