To effectively fix drainage problems in your yard, you should implement a combination of surface and subsurface solutions to redirect water away from your foundation.
### 1. Improve Surface Grading Establish a positive slope of at least 5% (roughly ½ inch of fall per foot) extending 6 to 10 feet away from your home. Use clean fill soil to raise low areas and compact it thoroughly to prevent future settling.
### 2. Install Subsurface Drainage
### 3. Manage Roof Runoff
### 4. Address Sunken Concrete Use polyurethane foam lifting to level sunken patios or walkways. This restores the proper grade and eliminates depressions that trap water against the foundation.
### 5. Utilize Natural Solutions Install dry wells or rain gardens using native plants with deep roots. These features intercept concentrated runoff from roofs and driveways, allowing it to infiltrate the soil safely away from the house.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…