Repairing stair-step cracks in brick veneer involves a two-step approach: addressing the underlying structural movement and sealing the visible damage. Because these cracks are typically caused by foundation settlement into expansive soils, it is critical to stabilize the structure before performing cosmetic repairs.
If the cracks result from active settlement, professional intervention is required to stop further movement:
Once the foundation is stabilized, the cracks themselves can be addressed:
It is highly recommended to consult a licensed structural engineer before beginning repairs. An inspection should include measuring crack widths (especially if they exceed 1/4 inch) and monitoring for progressive movement to ensure the chosen repair method is appropriate for the root cause.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…