How Long does the Actual On-site Installation for Foundation Repair Typically Take?

The on-site installation of Helical Piers is extremely quick once the necessary engineering reports and municipal permits are finalized. In most cases, we can stabilize your foundation in a single day.

Because we are The Experts in Steel Piers, we utilize specialized rotary equipment to drive steel shafts to a specific target torque. This method offers several advantages that keep your project moving fast:

  • No Cure Time: Unlike concrete-based methods that require days to harden, our steel systems allow for immediate loading and hydraulic stabilization.
  • Immediate Use: You can typically use the stabilized area the same day we begin our work.
  • Efficiency in Poor Soils: In challenging soil conditions, such as the expansive bentonite clay found throughout the Denver Front Range, our installation process can be up to 66% faster than traditional excavation and concrete replacement.

For minor issues like slab settling, we also offer Polyurethane Foam Lifting, which can restore a slab in just a few hours, with the foam reaching load-bearing capacity in approximately 15 minutes.

While the physical installation is rapid, please remember that the total project timeline includes essential preparatory steps like site preparation, utility clearance via 811, and obtaining permits. We provide site-specific timelines following an on-site inspection to ensure we account for your property’s unique soil conditions and structural needs.