The on-site installation of Helical Piers is extremely quick once the necessary engineering reports and municipal permits are finalized. In most cases, we can stabilize your foundation in a single day.
Because we are The Experts in Steel Piers, we utilize specialized rotary equipment to drive steel shafts to a specific target torque. This method offers several advantages that keep your project moving fast:
For minor issues like slab settling, we also offer Polyurethane Foam Lifting, which can restore a slab in just a few hours, with the foam reaching load-bearing capacity in approximately 15 minutes.
While the physical installation is rapid, please remember that the total project timeline includes essential preparatory steps like site preparation, utility clearance via 811, and obtaining permits. We provide site-specific timelines following an on-site inspection to ensure we account for your property’s unique soil conditions and structural needs.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…