Under the right conditions, Polyurethane Foam Lifting can provide a durable, long-term solution for sinking concrete slabs. Our experience shows that when the underlying soil is stable and the slab is not exposed to ongoing moisture or erosion, this method can function as a permanent fix. Unlike traditional mudjacking, which uses a heavy slurry that can wash out or add weight to the soil, polyurethane foam is lightweight, non-porous, and naturally resists erosion.
While polyjacking is highly effective, its longevity depends on a few key factors:
Because every site in Colorado deals with unique expansive clay soils, we provide custom quotes to ensure you get the most effective solution for your specific conditions.
All information is for general purposes and may be updated without notice. Estimates are preliminary and not legally binding until confirmed in writing following an on-site inspection. We do not guarantee specific results for every project; actual outcomes depend on site conditions. Consult a licensed structural engineer for definitive diagnosis and design recommendations.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…