The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited laboratories.
According to these standards, the evaluation process involves several critical factors:
While AC358 determines the tested limits of the product, we emphasize that final installed capacity always depends on site-specific soil conditions. All information is for general purposes, and we recommend consulting a licensed structural engineer for definitive design recommendations. Actual outcomes depend on site conditions and inspections.
Whether you need a sump pump for your Denver basement depends on your property’s specific water table and foundation type. Because Denver features expansive clay soils and variable groundwater levels, a sump pump is often a critical component of a…
In Colorado, particularly in the Denver area, perimeter drains prevent foundation damage by actively managing groundwater and relieving hydrostatic pressure. This is critical because the region’s expansive clay soils absorb significant moisture, causing them to swell and press against foundation…
Installing a vapor barrier in your crawl space is highly recommended to control moisture migration and protect your home’s structural integrity. While drainage systems manage liquid water, vapor barriers address moisture in its gaseous form. According to industry standards, here…
Poor drainage contributes to foundation settlement through a destructive cycle of soil movement and excessive pressure, particularly in the Denver area’s expansive clay soils. When water is not properly directed away from a home, it creates several structural threats: While…
The cost of installing a French drain around a foundation in Denver is hard to pin down exactly, actual project costs can vary based on several factors, including site conditions, soil composition, and the specific scope of the project. While…