We utilize several advanced, modern techniques to repair industrial and commercial floor cracks without the need for costly full-scale removal. Our methods focus on restoring structural integrity and leveling settled slabs with minimal site disruption.
As a family-owned and operated company since 1996, we adhere strictly to ICRI and ASCE industry standards. Because actual outcomes depend on specific site conditions, we recommend a professional on-site inspection to determine the most effective strategy for your facility.
All information is for general purposes and may be updated without notice. Estimates are preliminary and not legally binding until confirmed in writing following an inspection. We do not guarantee specific results for every project. Consult a licensed structural engineer for definitive diagnosis and design recommendations.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…