Yes, ICC-ES AC358 specifies rigorous and standardized load testing procedures to verify that helical pier systems perform as designed under field conditions. These protocols ensure that results are reliable and comparable across different projects and testing agencies.
The standardized load testing process follows a specific sequence:
Additionally, AC358 defines a torque-to-capacity relationship (Section 5.3) that allows for real-time field verification of design capacity during the installation of every pier.
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…
To ensure a compliant helical pile submittal under IBC 2026, a comprehensive documentation package is required. This package must satisfy the geotechnical, structural, and quality-control standards established in Chapter 18 of the code. The core submittal documents include: As the…
When comparing Polyurethane Foam Lifting to traditional concrete replacement, the longevity of the repair is a significant advantage because it addresses the root cause of the problem. While new concrete provides a fresh surface, it does not fix the underlying…
Yes, Polyurethane Foam Lifting is often the more economical choice compared to a full concrete replacement. Our injection method allows you to avoid the high costs associated with demolition, hauling away old materials, and pouring new concrete. The primary cost-saving…
When you are researching custom home builders with financing for your 2026 project, we focus on providing the structural foundation solutions that support these financing models. While we are a foundation specialist rather than a lender, we work closely with…