While some manufacturers may label them as permanent, a floor stabilizer post kit is generally considered a temporary or semi-permanent solution rather than a permanent foundation repair. Its effectiveness is limited by the following factors:
For a truly permanent solution, especially when dealing with active settlement or loads exceeding 12,000 pounds, an engineered helical pier system is recommended. Helical piers reach competent load-bearing strata deep underground, bypassing unstable surface soils to provide decades of stability.
Before installing any support system, it is critical to consult a licensed structural engineer to evaluate the entire load path and confirm the structural integrity of your foundation.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…