The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited laboratories.
According to these standards, the evaluation process involves several critical factors:
While AC358 determines the tested limits of the product, we emphasize that final installed capacity always depends on site-specific soil conditions. All information is for general purposes, and we recommend consulting a licensed structural engineer for definitive design recommendations. Actual outcomes depend on site conditions and inspections.
Water pooling at the cove joint—the area where your basement floor meets the foundation wall—is typically a sign of basement perimeter drain system failure. When your perimeter drain (also known as a French drain or footing drain) fails, it can…
Identifying a basement perimeter drain system failure early is critical to preventing significant structural damage. When these systems—often called French drains or footing drains—fail due to sediment clogging, pipe collapse, or improper slope, they no longer provide the necessary hydrostatic…
A constantly running sump pump is a strong indicator that your drainage system is under significant stress and may be struggling to manage a basement perimeter drain system failure. A sump pump is designed to actively remove groundwater that would…
When a weeping tile (or perimeter drain system) fails due to a clog or collapse, it can no longer provide essential hydrostatic pressure relief. This leads to several distinct warning signs: Failures typically occur when sediment and fine debris accumulate…
Yes, Foundation Repair can fix doors that will not latch or close properly when the root cause is structural settlement. In our experience serving Colorado since 1996, we find that as a foundation shifts, the home’s framing torques out of…