During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements.
We record the following specific data points during installation:
This real-time data collection allows for immediate adjustments if a pile deviates from alignment or if torque trends vary from expectations. These records are compiled into a final as-built package that serves as the permanent record for your property.
Disclaimer: All information is for general purposes; actual outcomes depend on site conditions. Consult a licensed structural engineer for definitive design recommendations.
A professional structural forensic report, prepared by a licensed Professional Engineer (PE), is a comprehensive diagnostic document that identifies the root causes of foundation distress. Unlike a basic contractor walkthrough, this report is based on empirical data collection and structural…
The cost of helical pier installation is influenced by several site-specific and technical variables. Because no two properties have identical ground conditions or structural needs, pricing is typically determined through custom quotes rather than flat rates. Key factors influencing the…
The manufacturing, testing, and installation of commercial helical piers are governed by several specific ASTM International standards to ensure structural integrity and predictable performance. These include:ASTM F3143-18: This serves as the primary standard for commercial helical piles, establishing minimum requirements…
Based on the provided content, there are eight primary causes of foundation failure and structural distress:Poor Drainage and Water Accumulation: This occurs when water pools near the foundation due to improper grading, clogged gutters, or short downspout extensions, which can…
The load capacities for commercial helical piles are determined through a systematic combination of engineering analysis and real-time installation data. Rather than a single fixed value, capacity is verified using the following methods:Torque-to-Capacity Correlation: During installation, rotary equipment records the…