Accurate and thorough documentation is the backbone of a reliable helical pile installation. As The Experts in Steel Piers, we prioritize recording the torque-to-capacity correlation for every pier we install because it provides immediate, real-time verification of foundation performance. This documentation creates a permanent record for engineers and property owners, ensuring every shaft meets design specifications.
To ensure your project meets ASCE and ICRI standards, we recommend following these documentation best practices:
Our team has been family-owned and operated since 1996, and we maintain these rigorous standards to provide traceable, long-term accountability for every residential and commercial project. Please note that all estimates are preliminary and all capacity estimates should be reviewed by a licensed structural engineer, as actual outcomes depend on site-specific inspections.
The cost of foundation repair in 2026 varies significantly based on the specific challenges of your property, particularly due to the expansive clay soils and freeze-thaw cycles common in the Front Range. Because every home is different, we utilize a…
Choosing between foundation piering and crack injection involves weighing long-term structural stabilization against localized sealing. As family-owned and operated since 1996, we provide both services, but their costs reflect very different scopes of work. Crack Injection Epoxy Injection / Crack…
The ICC-ES AC358 (Acceptance Criteria for Helical Pile Systems) provides the essential framework we use to evaluate and verify helical pile lateral resistance. Unlike standard design tables, AC358 evaluation reports are based on results from full-scale testing conducted by accredited…
Determining the lateral load capacity for ICC-ES compliance involves a multi-layered engineering approach that combines full-scale laboratory testing, shaft geometry analysis, and field validation. To meet ICC-ES AC358 standards, the lateral capacity of our helical pier systems is determined through…
During the continuous special inspection of a helical pile installation, our team and the assigned special inspector must record specific field data to verify that the as-built foundation aligns with the engineered design and IBC 2026 requirements. We record the…